Practice Description: The project owner provides the excavator with
          accurate location information on the proposed excavation area and scope of
          work This information includes: a street address, street intersection, legal
          description, a starting point, ending point and on which side of the property
          (North, South, East, West, front, back, rear, sides, etc.) distance from nearest
          intersection or other acceptable format and latitude/longitude if feasible.

          Current Practice:
          •  Project owner provides information to excavator which is referenced to
            the notification service map.
          •  Today, “starting and ending points” tend to be descriptions - not
            coordinates; however greater use of mapping technologies will facilitate
            this information being provided.
          •  There is currently a variety of referencing methods for tying-in proposed
            construction (C/L, P/L, etc.) which is facility owner specific and may/may
            not be tied to universal survey control points.

          References:
          •  CSA S250-11, Mapping of Underground Utility Infrastructure














































                       Canadian Common Ground Alliance
                      Best Practices Version 3.0 – October 2018